I-MED Radiology Peninsula Private Hospital

Project Summary

Location: Peninsula Private Hospital, VIC

Type: Commercial / Healthcare

Services: Complete mechanical services, including VRF climate control, ventilation, filtration and Building Management System integration.

Timeline: Completed May 2026

Client Brief

Webster Construction engaged CoreTemp Australia to deliver the complete mechanical services package for the IMED Radiology extension at Peninsula Private Hospital.

The project required more than the supply and installation of a heating and cooling system. CoreTemp was engaged for our technical capability, coordination experience and ability to deliver a fully integrated solution within a complex healthcare environment and condensed construction programme.

Their requirements included:

  • Reliable and flexible climate control throughout the new radiology facilities.
  • Hospital-grade air filtration to support the environmental requirements of a modern medical imaging department.
  • Fresh air and exhaust ventilation systems designed around the facility’s operational needs.
  • Integration of the mechanical services into the hospital’s Building Management System.
  • Dedicated mechanical services switchboards.
  • Coordination with fire services and medical gas systems.
  • Specialised service penetrations through lead-lined walls and ceilings.
  • Careful multi-trade coordination within severely restricted ceiling spaces.
  • Delivery within an accelerated construction programme.
  • A compliant, fully commissioned system ready for operation within the healthcare facility.
Complimentary Advisory Session

CoreTemp Australia was engaged by Webster Construction to deliver the complete mechanical services package for the IMED Radiology extension at Peninsula Private Hospital.

Working within an operational healthcare environment and an accelerated construction programme, our experienced team delivered a technically complex solution incorporating heating, cooling, ventilation, hospital-grade filtration, controls, switchboards and coordination with essential building services.

This was not a simple installation. Restricted ceiling space, lead-lined walls and ceilings, medical gas services and multiple trade interfaces required detailed planning from the outset. Every element needed to be carefully coordinated to ensure the completed system met the environmental, operational and safety requirements of a modern medical imaging facility.


Services Provided

With extensive experience delivering technically complex commercial and healthcare projects, CoreTemp Australia provided a fully coordinated mechanical services solution for the IMED Radiology extension.

Our scope included the design, supply, installation and commissioning of the following:

  • System Design and Multi-Trade Coordination
    Working alongside Webster Construction and the wider project team, CoreTemp planned and coordinated the mechanical services package around the facility’s clinical requirements, restricted ceiling spaces and accelerated programme. Every duct, pipe, cable tray and building service needed to be carefully positioned to avoid clashes and ensure all trades could work successfully within the available space.
  • Mitsubishi Electric VRF Two-Pipe Heat Recovery System
    A Mitsubishi Electric VRF two-pipe heat recovery system was installed to provide reliable and flexible climate control throughout the radiology extension. The system incorporated a combination of ducted and cassette fan coil units, allowing the heating and cooling solution to respond to the requirements of different rooms and clinical spaces across the facility.
  • Hospital-Grade Air Filtration
    Hospital-grade air filtration was installed throughout the project to support the stringent environmental requirements of a modern medical imaging department. The filtration system formed an important part of maintaining a controlled and comfortable environment for patients, clinical staff and specialised equipment.
  • Fantech Ventilation Systems
    Fantech ventilation systems were integrated to provide the required fresh air and exhaust solutions throughout the extension. These systems were coordinated with the wider mechanical installation to support air quality, compliance and the operational needs of the new radiology facilities.
  • Mechanical Services Switchboards and BMS Integration
    CoreTemp completed the installation of dedicated mechanical services switchboards and integrated the heating and cooling system into the hospital’s Building Management System. This provides centralised monitoring and control of the mechanical services, supporting ongoing system management and operational performance.
  • Fire Services Integration
    Our team coordinated closely with the fire services contractor to complete all required interfaces between the mechanical and fire protection systems. This ensured the systems operated together correctly and met the project’s safety and compliance requirements.  
  • Medical Gas Services Coordination and Extensions
    CoreTemp worked alongside the hydraulic contractor to coordinate the extension and connection of medical gas services required for the new radiology facilities. This added another layer of complexity to the project and required close collaboration across multiple trades.
  • Lead-Lined Wall and Ceiling Penetrations
    The radiology environment required lead-lined walls and ceilings to shield specialised imaging equipment. Any service penetrations through these areas required detailed planning, specialised installation methods and lead flashing to maintain the integrity of the shielding throughout the facility.
  • Testing, Commissioning and Handover
    All systems were tested and commissioned to confirm correct operation before handover. The completed installation was delivered within the required programme and prepared for integration into the hospital’s ongoing operational and maintenance procedures.
Outcome

The IMED Radiology extension demonstrates CoreTemp Australia’s capability in delivering complex mechanical services within highly specialised healthcare environments.

Despite the restricted ceiling space, lead-lined construction, multiple essential service interfaces and accelerated programme, the project was successfully completed through early coordination, detailed planning and proactive communication between all project stakeholders.

The completed system provides reliable climate control, hospital-grade filtration, integrated ventilation and coordinated building services throughout the new radiology facility.

The project further strengthened CoreTemp Australia’s healthcare capability and reinforced our strong working relationship with Webster Construction. With extensive experience delivering medical facilities, Webster Construction continues to build an impressive portfolio within this specialised sector, and we look forward to partnering on future healthcare projects.

More Related Case Studies

Contact Our Team

Looking for a trusted partner to deliver commercial HVAC solutions for your project?

From medical imaging facilities to hospitals and specialist healthcare environments, CoreTemp Australia delivers coordinated heating, cooling, ventilation and mechanical services across Melbourne and Victoria. Discuss your next healthcare project with our team.