HVAC planning for a new commercial premises starts well before the air conditioning is installed. Where will the ductwork run? Is there enough ceiling or rooftop space for the equipment? How many zones will you need? And which type of system makes sense for the way the space will actually be used?

These decisions can affect everything from ceiling layouts and electrical requirements to plant space and the work of other trades. Sorting them early can make for a smoother fitout and help avoid costly changes once work is underway.

At CoreTemp, we work with businesses, builders and facility managers on commercial air conditioning installation across Melbourne and the Mornington Peninsula, from initial system planning through to installation and commissioning.

Here are some of the key things to consider before your commercial fitout gets underway.

1. Start With Heating and Cooling Load Calculations

Before deciding on equipment, you need to know how much heating and cooling the premises will actually require. Two commercial spaces of the same size can have very different loads depending on how they’re built and used.

A load calculation takes into account factors such as:

  • Floor area and ceiling height
  • Building orientation and glazing
  • Insulation and construction
  • Number of occupants
  • Operating hours
  • Heat generated by lighting and equipment
  • How different areas will be used
  • Ventilation and fresh air requirements


A busy restaurant, for example, can have very different cooling requirements from an office of a similar size, with kitchens, refrigeration equipment, lighting and high customer turnover all adding to the load.

CoreTemp’s commercial HVAC team can assess your premises and its intended use to help determine the heating and cooling capacity required. These calculations provide the starting point for designing a system that meets the building’s needs without unnecessary equipment or capacity. 

2. Allow Enough Space for Ductwork

When planning the HVAC design for a new commercial building or fitout, duct routes need to be considered alongside the rest of the project.

Ceiling cavities can quickly become crowded with lighting, electrical services, fire systems, plumbing and other infrastructure. Planning early allows the HVAC contractor and other trades to coordinate where services will run and identify potential conflicts before installation begins.

The position of supply and return air outlets also matters. Their location can affect how evenly conditioned air is distributed and needs to work with the final layout rather than simply fitting wherever space remains.

3. Consider Where the HVAC Equipment Will Go

Depending on the system selected, a commercial HVAC installation may require outdoor condensers, rooftop equipment or larger plant areas. These locations need suitable clearances, airflow and safe access for installation and ongoing maintenance.

For rooftop equipment, the design may also need to consider structural capacity, available roof space, penetrations and future servicing requirements. Considering these requirements early helps ensure there is a practical location for the system you plan to install.

4. Decide How the Premises Need to Be Zoned

Think about how each area will actually be used once the doors open. An office may have meeting rooms used intermittently, open-plan areas occupied all day and perimeter spaces that receive more afternoon sun. A retail fitout might include a busy shop floor alongside stockrooms and staff areas with very different heating and cooling needs.

Planning these zones early in conjunction with a HVAC specialist helps determine where individual temperature control is needed and which type of commercial HVAC system will work best for the layout. 

5. Choose the Right Commercial HVAC System

By this stage, your load requirements, available plant space and zoning needs should start pointing towards the most practical system for the fitout. A VRV system, for example, can provide greater flexibility across multiple zones, while a rooftop unit may make more sense for a large open commercial space.

The number of zones, available ceiling and rooftop space, operating hours and level of individual control required can all influence the final choice. 

With experience across different commercial HVAC systems, CoreTemp can help you compare the available options and develop a design suited to your premises. Our team considers how the space will be used, the installation requirements and ongoing servicing needs before recommending a system.

Ducted Inverter Systems

Commercial ducted inverter systems can suit smaller to medium-sized premises, distributing conditioned air through concealed ductwork. They can be a practical option where a clean, unobtrusive finish is important and there is sufficient ceiling space for ductwork. Zoning can also provide greater control over different areas.

VRV/VRF Systems

VRV/VRF systems allow multiple indoor units to connect to an outdoor system, providing flexible control across individual zones. This can make them well suited to offices, multi-room premises and more complex commercial layouts where heating and cooling needs can vary throughout the day.

Rooftop Packaged Units

Rooftop packaged units combine major HVAC components into equipment installed on the roof. They can suit larger open commercial spaces while freeing up valuable indoor space. They also keep much of the equipment in one location, although suitable roof space, structural capacity and service access need to be considered during the design.

6. Plan for Ventilation and Fresh Air

Ventilation requirements need to be mapped out alongside the heating and cooling system, particularly in high-occupancy spaces or areas that generate heat, moisture, odours or airborne contaminants.

This is especially important for hospitality fitouts, where kitchens, dining areas and other spaces can have very different requirements. Planning for ductwork, fans and fresh air systems early means they can be coordinated with the ceiling layout and other services before the fitout gets underway.

7. Plan for Servicing From the Beginning

Service access should be considered before ceilings, joinery and other finishes are locked in. Filters, indoor units, access panels and rooftop equipment all need to remain accessible without requiring unnecessary disruption to the finished space.

Factoring this into the design makes future HVAC servicing more straightforward and helps minimise disruption once the premises are in use.

Planning a Commercial Air Con Fitout in Melbourne?

From load calculations and system selection to ductwork, installation and commissioning, CoreTemp can work with your builder, designer, project team or facility manager to plan the HVAC requirements for your new premises.

We provide commercial HVAC solutions across Melbourne and the Mornington Peninsula, with each system designed around the space, its intended use and the practical requirements of the fitout.

Planning a new office, retail store, hospitality venue or other commercial premises? Talk to our team about your heating, cooling and ventilation requirements.